Lost Profit Claim is Constrained by Low Bid Setting
May 11th, 2016
A contractor was the lowest bidder on a public project, and the second-low bidder was only $11,705 higher. A consultant later discovered that some of the bid quantities that it provided to the contractor (pre-bid) were mistaken. The contractor, who s…