sign-off

Contractor Can’t Blame Inspector Who Failed to Note Non-Compliant Work

An electrical contractor was supposed to run power cables through conduit, but elected on its own to run about 40% of the power cable with flexible metal-clad (MC) cable, without conduit. For a large portion of the project, Army Corps of Engineers in… Read More
Read More