sign-off
Contractor Can’t Blame Inspector Who Failed to Note Non-Compliant Work
April 13th, 2020
An electrical contractor was supposed to run power cables through conduit, but elected on its own to run about 40% of the power cable with flexible metal-clad (MC) cable, without conduit. For a large portion of the project, Army Corps of Engineers in…
Read More
Read More
Categories: Construction